EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BearhawkPatrol
-
Listing for Category : flap system
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (38)
Aileron
- (1)
Airbox
- (1)
Autopilot
- (1)
Avionics
- (1)
Boot Cowl
- (3)
Brakes
- (1)
Controls
Door&Window
- (1)
Elevators
- (1)
Empennage
- (1)
Engine
Eng. Baffles
- (1)
Engine Cowl
- (1)
Engine Mount
- (1)
Firewall
Flap System
- (3)
Fuel System
- (1)
Fuselage
- (2)
Inspection
- (1)
Instrument Panel
Interior Finish
- (1)
Landing Gear
- (2)
Lighting
Paint / Decals
Propeller
Research
Rotisserie
- (1)
-
Airplane Rotator
Seating
- (1)
Tail Feathers
Throttle
- (1)
Tools
Tunnel
- (1)
Wings
- (1)
Wing Tanks
- (3)
Workshop
Wing-Left
- (1)
Wing Mount
- (1)
Windshield
- (2)
Builder Name:
Bruce Case
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
1383
Start/Last Date:
Jul 10, 2018 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=BearhawkPatrol
Home or Last Project Picture
Nov 11, 2022
Flap System Install
- (40 hours)
Category: Flap System
Hanging flaps and rigging
Full Flaps.jpg
Flap Pulley-1.jpg
Flap Pulley-2.jpg
Flaps-1.jpg
Aug 24, 2021
Flap Pulley Reinforcement
- (24 hours)
Category: Flap System
Fuselage flap pulley needs reinforcement to prevent tear out of mounting bolt.
DSC_1752-S.jpg
Sep 23, 2020
Pulley Guard for Flaps
- (6.1 hours)
Category: Flap System
Pulley guard. One piece one each side of pully. Cotter pins through holes for control cable constraint.
Pulley Guard.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.